2001

11 January 2001: The waveguides are there

11 January 2001: The first racks are installed


15 February 2001: The first version of the vacuum control

15 February 2001: The first version of the magnet control


22 February 2001: The acceleration inside the gun

07 March 2001: The first version of the water control


13 March 2001: The gun is completely connected

19 March 2001: The water circuit with the 3-way-valve and temperature- / pressure-sensors


11 April 2001: The waveguides reaches the gun

23 April 2001: The cathodes are under vacuum


27 April 2001: The principle of a klystron

27 April 2001: The principle of a klystron


7 May 2001: The principle of laser - cathode - electron beam

15 June 2001: The gamma and the neutron detector for the radiation protection system


23 July 2001: Trafo and klystron in the klystron hall

13 September 2001: Commissioning of the rf system


13 October 2001: Laser system ready

18 October 2001: Gun, rf input coupler and solenoids


13 December 2001: First rf in the gun

December 2001: View of the PITZ setup at the start of the PITZ1 operation