PITZ

| Photo Injector Test Facility at DESY, Zeuthen site

Facility upgrade

Conversion to stage PITZ1.7 is being realized.

Photo Injector Test Facility at DESY, Zeuthen site

Facility upgrade

Conversion to stage PITZ1.7 is being realized.

Important steps are:
- Installation of a newly designed DDC
- Upgrade of the low energy spectrometer LEDA1
- Installation of a new high energy spectrometer (HEDA1) after the booster cavity, for more precise measurements of the electron’s momentum distribution

DSCF2631_thumbnail.jpg
IMG_7369_thumbnail.JPG
IMG_9547_thumbnail.JPG