PITZ

| Photo Injector Test Facility at DESY, Zeuthen site

January: Gun4.2 in operation at FLASH

January: Gun4.2 went into operation at FLASH

This gun was specially prepared at PITZ for operation with long pulse trains.

Photo Injector Test Facility at DESY, Zeuthen site

January: Gun4.2 went into operation at FLASH

This gun was specially prepared at PITZ for operation with long pulse trains.

Gun4_2_eingebaut001_thumbnail.jpg